South Line (Starter Line) – Overview
· Transit agency: Charlotte Area Transit System
· Project route length: 9.6 miles (15.5 km) (April 2005)
· Number of stations: 15 (April 2005)
· Weekday ridership: 9,100 (initial year) (projection, 2005)
· Vehicle fleet size: 16, with option on additional 25
· Projected total cost: US $427 million (2005), or about $44 million per mile
· Projected startup of operations: 2007
Vehicles – Siemens (2004)
· Fleet size: 16 (April 2005)
· Width: 8.7 ft (2640 mm)
· Height: 12.1 ft (3670 mm)
· Length: 91.3 ft (27670 mm)
· Weight: 67,470 lb (44300 kg) empty, 133,970 lb (60895 kg) fully loaded
· Maximum operating speed: 55 mph (90 kph); capable of 65 mph (105 kph)
· Passenger capacity: 68 seated, 168 standing (nominal)
· Other features: 70% Low-floor vehicles for level boarding; fully bi-directional; capable or multiple-unit (MU) operation as 1, 2, or 3 car trains